Case
Study 'Ventilation
& Air-Conditioning'
Client: Viridor
Waste Management, Kent
Technology: Heating
& Ventilation System
Grosvenor Waste Management provide materials
recycling facilities for local authorise, diverting waste
from landfill sites.
Waste is sorted into designated areas, dependant on its
composition. The sorting process involves bulk waste travelling
at high speeds within an enclosed sorting plant.
The client required pressurisation of the work area to reduce
airborne dust levels from the external yard and provide
clean air breathing zones for staff working alongside the
conveyor system.
The introduction of ventilation required that any incoming
air be filtered through primary and final stage filters,
located within the air handling unit.
The plant also lacked heating for winter months; this coupled
with the fact that additional external air would be introduced
to the area, resulted in the requirement for a heating coil
to be added to the system.
The client experienced a dramatic reduction in dust levels
within the area with some staff removing their respiratory
protection equipment. Internal ambient air temperatures
remained constant at 21oC in the winter months.